|
|
 |
Sigma To Cpk Conversion Table
| Sigma | Cpk | | 1.5 | 0.50 | | 3.00 | 1.00 | | 3.50 | 1.17 | | 4.00 | 1.33 | | 4.50 | 1.50 | | 5.00 | 1.67 | | 6.00 | 2.00 |
Assumptions No analysis would be complete without properly noting the assumptions made. In the above table, we have assumed that the standard sigma shift of 1.5 is appropriate (the calculator allows you to specify another value), the data is normally distributed, and the process is stable. In addition, the calculations are made with using one-tail values of the normal distribution. Related > How to Calculate Process Sigma Related > Sigma to DPMO to Yield to Cpk Table
Copyright © 2000-2008 iSixSigma All Rights Reserved Reproduction Without Permission Is Strictly Prohibited Copyright Requests
Publish an Article: Do you have a Six Sigma tip, learning or case study? Share it with the largest community of Six Sigma professionals, and be recognized by your peers. It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.
Download the iSixSigma Toolbar for 1-Click access. Search Your Way. Everyday. Without Delay.

|
 |
|