Six Sigma Quality Resources for Healthcare In association withGE Medical Systems
 Main Site > Healthcare Channel > Methodologies  > Six Sigma Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.99
iSixSigma Magazine Signup
 iSixSigma Live!  
  Summit & Awards
  Most Successful Start-up
  Breakthrough Projects
  Speaker Proposals
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  iSixSigma Main
  Europe
  Financial Services
  Military
  Software / IT
 Quality Directory 
  Recent Articles
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
   BPR
   DMAIC
   Kaizen
   Metrics
   Six Sigma
   TQM
   Work-Out
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Six Sigma Improves Workflow in N-Medicine Department

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • Discussion Forum
    "I...need some assistance with a cycle time reduction project...at a healthcare facility....there is a significant opportunity (backed by customer complaints), that the total patient wait time before service is provided is excessive."

    Contribute to this Discussion

    B
    New from iSixSigmaDMAIC Best-Sellers Project Examples

    Medical Parts Delivery Project Example

    Project Selection Research Report
    y Mara Migliazza

    The nuclear medicine department located in the Ospedale Santa Croce e Carle in Cuneo, Italy, has always been recognized as a national and international reference site for its clinical compentencies and innovative facility design.

    When originally opened, the nuclear medicine department was structured to provide the best possible service to patients. This included a focus on state of the art equipment, the latest clinical protocols and diverse professional compentencies of its staff. Today this department is still working hard to deliver excellent service to patients, at the same time being concerned about staff satisfaction and facing new challenges like, for instance, budget constraints.

    Opening the Door to a Six Sigma Project

    From the beginning of a Six Sigma continuous improvement, the key stakeholders were driven by an open-minded approach to sharing the department problems and issues, in order to benefit the department as much as possible.

    In computed tomography (CT) or magnetic resonance imaging (MRI) modalities, patients rely on equipment to obtain diagnostic images. In functional imaging, however, patients are injected with a radioactive pharmaceutical and the patients themselves emit rays, which are detected by gamma camera or a positron emission tomography (PET) system, according to the energy window of the radioactive drug used for the clinical investigation needed.

    In almost all types of exams, from the time of the injection to image acquisition, it is necessary to wait some time in order to have the radiopharmaceutical fixed in the region of the patient's body where the pathology is located. This uptake time is the fundamental element to be taken into account during daily and weekly scheduling for each kind of exam. Another important issue is the characteristic of the acquisition systems, considering that in this department there are four gamma cameras (three single-head, and one dual-head system) and one PET-CT scanner. On the whole, the number of exams performed yearly is about 20,000 (including 11,000 in vivo studies, 4,200 dual-energy x-ray absorptiometry (DEXA), 2,700 thyroid endoscopies and 2,800 PET-CT investigations) divided among inpatients (15 percent), outpatients (80 percent and emergency department patients (less than 5 percent).

    From CTQs to the Define Phase

    During the project kick-off meeting, the critical-to-quality elements (CTQs) came up clearly and the project focus was set on the evaluation of the nuclear medicine department activity and workflow, as well as the thyroid endoscopy. The PET-CT environment was kept out of the project scope as noted in the table below.

     In and Out of the Project

    In Scope

    Out of Scope

    Four Gamma Camera ActivityPET/CT and DEXA Personnel Activity 
    Standard Personnel ShiftPersonnel Overtime
    Inpatients, Outpatients and ED Patients Nuclear Medicine External Activity (e.g., Operating Room)
    Nuclear Medicine and Thyroid Endoscophy Activity 

    The application of Six Sigma methodology was well suited to addressing a long process cycle time (from exam booking to report delivery), and the need to track it in order to check where and why it was delayed.       

    Actually, the nuclear medicine department had already mapped the process workflow in a high level process map from exam booking until report delivery. This provided a headstart for the Six Sigma project. In addition, the department had other issues related to staff communication and patient satisfaction as well as a long waiting list for bone and cardiac exams (20 and 40 days).

    Going to the Measure Phase

    The project team began the data collection by setting up two separate forms – one for nuclear medicine department and one for endoscophy activities – to capture the timing of every single step of the processes from exam booking to report delivery date. This included the type of investigation, the camera used, the number of acquisitions executed, the waiting time in between the different steps, etc.

    Both processes were divided in two parts – from exam booking to report delivery and patient wait time in the department. The wait time was defined as from administrative admission to the exit. The team wanted to study in detail which process steps plays a key factor (Figure 1), keeping into account for endoscophy, the parts in which the physician is in charge (Figure 2).

     Figure 1: Nuclear Medicine Cycle Time Process and Exam

     Figure 2: Thyroid Endoscopy

    What the Project Team Analyzed

    The data analysis pointed out some surprising situations, in other cases, problems were exactly as expected, such as the bottleneck for the clinical history capture. It had a long wait time (24 minutes) due to the fact that there was just one physician and one ward dedicated to this activity.

    From the statistical analysis of the process cycle time, the waiting list for cardiac and bone exams turned out to be quite long as expected, 43 and 23 days for outpatients, although still within the local requirements (60 days).

    As a matter of fact, the cardiologists' availability for the nuclear medicine department activity was fixed and related to their activity in the cardiac department, but it represented the key to decreasing the waiting list, adding a weekly session and helping the department gain a competitive advantage over the hospitals located nearby.

    The problem about the bone scan waiting list had been figured out when the project team analyzed the camera workload. The data was not consistant with the daily agenda as scheduled. For example, the whole body acquisition, which is one of the longest scan, had been performed from time to time with the single-head camera even though the dual-head one was available. It takes the single-head camera twice as long to scan.

    According to the camera workload analysis, 40 percent of the acquisitions had been performed by the dual-head system, while the exam length and the downtime were too long for the single-head ones. This is where the idea to replace one of the single with a dual camera came from.

    In addition to the suggestion of new equipment, these other ideas were raised during the project:

    • An additional ward for the patient clinical history capture.
    • A dual-head camera room.
    • A physician reporting room.
    • Minimize the patient path, keeping the attention on the radioprotection issue.

    As the team considered physical changes in the department, it used a spaghetti chart, a Lean tool, to help in redesigning the layout.

    From Analysis to Improvement

    The opportunity to have a reporting room could solve a workflow problem raised by the data analysis: The patient length of staying in the gamma camera room compared to the acquisition length was too long. This was because, after the acquisition, the technologist had to look for a physician to see if there was any need for further investigations. This left the patient in the acquisition room and delaying the schedule.

    In the analysis of endoscopy activities, the data showed the process cycle time was extremely long with excessive variability – an average of 50 days with a standard deviation of 36 days. Statistical analysis indicated three different sub-processes for inpatients, outpatients and patients with a check-up fixed from 60 to 90 days (70 percent out of the total exams). This fact explained the process cycle time length.

    Another big issue was related to the fact that at least 15 percent of scheduled outpatient appointments did not present themselves at the endoscopy exam. The reason was the unacceptable waiting list of 15 days. This was considered by patients as too long compared to the same investigation done in private centers.

    The project team checked the feasibility and suggested adding a patient in the daily agenda in order to shorten the waiting list and become more competitive.

    Conclusion: 30 Percent Less Waiting

    Overall, the Six Sigma project helped the nuclear medicine team to better understand and uncover some of the issues it has been facing in the routine workflow management. The project ultimately led to a 30 percent reduction in patient waiting time and an increase of the equipment utilization rate, while maintaining staff and patient satisfation.

    About the Author: Mara Migliazza joined Performance Solutions Group at GE Healthcare as a Black Belt and Lean Champion in 2005. She has six years working experience in the healthcare environment. She can be reached by email at mara.migliazza@ge.com.

     
    Rate This Article:  Current Rating: 4.26
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2008 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.


    Download the iSixSigma Toolbar for 1-Click access. Search Your Way. Everyday. Without Delay.
    Get 1-Click iSixSigma access. Search Your Way. Everyday. Without Delay.

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. 2008 VERSION! Six Sigma DMAIC Training Slides
      The complete Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering what’s ...
    2. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    3. NEW VERSION! Process Management Training Slides
      The OSSS Process Management course is designed in two phases comprised of:352 Powerpoint slidesInstructor notesSlide exp...
    4. Gage R&R Excel Template
      Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
    5. FMEA Excel Template
      Need to be more preventative, prioritize risks, or brainstorm possible failures in a process or product? Use the FMEA to...
    6. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    7. NEW VERSION! Six Sigma Black Belt (DMAIC) Training Slides
      The OSSS Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
     

    Six Sigma AdLinks
    Earn Your Six Sigma Green Belt or Black Belt Certificate Online
    SBTI: Six Sigma for Healthcare
    Juran Healthcare: Transforming Healthcare
    Novaces: Six Sigma for Healthcare
    iSixSigma Live! Save up to $700


    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2008 iSixSigma. All rights reserved. v3.0lb, 10.6-A-244
    About iSixSigma · Contact Us · Privacy Policy · Site Map
    nogeo