Six Sigma Quality Resources for Healthcare In association withGE Medical Systems
 Main Site > Healthcare Channel > Methodologies  > Kaizen Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  iSixSigma Live! Summit
  Agenda
  Registration Info
  Breakthrough Awards
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  iSixSigma Main
  Europe
  Financial Services
  Military
  Software / IT
 Quality Directory 
  Recent Articles
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
   BPR
   DMAIC
   Kaizen
   Metrics
   Six Sigma
   TQM
   Work-Out
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Choosing Kaizen to Overcome Challenges in ED Project

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • Discussion Forum
    "I am a Black Belt (in training) and my project is reducing overall length of stay or TID for the adult discharge population in our busiest emergency department. ...we are drowning in patients...the mean TID for 10 days in April was 5.25 hours..."

    Contribute to this Discussion

    B
    Download Products
    y Lou Rhodes, Rhonda Davis, Eleanor Killam and Kathy Bradley

    What happens when an emergency department (ED) undergoes major upheaval in the midst of a Six Sigma project? Just such a situation befell a newly trained Black Belt who was working on her first project at Memorial Hermann Southwest Hospital in Houston, Texas, USA.

    • One month into the project to reduce cycle times, the ED director, who was the project sponsor, departed.
    • Two months into the project, the hospital administration overhauled the ED process flow.
    • Three months into the project, a portion of the ED was closed down and a new director was named.

    After being compelled to reset her project several times, the Black Belt faced a progress report deadline. Arguably, selection of a project within such a potentially unstable area should never have occurred. But it did and unfortunately, despite the challenges, the project now had to make some progress fast.

    Deciding on a Kaizen Effort

    To deliver a quick assessment of the current state of the emergency department and create solutions, the Black Belt decided to apply Lean concepts. With consultant assistance, she led a Kaizen event and delivered ED improvements in three areas in only four days.

    A Kaizen is a directed effort that applies Lean principles to assess a value stream, identify sources of cost and waste, and reduce those sources, all within a short time frame. The Black Belt and her team began with an assessment of ED processes, including development of a:

     Figure 1: Time Value Analysis by Department

    Process map: An ordered map of each step that makes up a process.

    Spaghetti map: A graphic showing the movements of the patients and caregivers.

    Time value analysis: A chart identifying time spent on value-added and non-value added activities (Figure 1).

    Value stream map: A representation of the patient, caregivers, supplies and information flows including time value analysis components (Figure 2).

    The spaghetti map illustrated the significant number of moves that caregivers and the case manager applied to treat a single patient. Also of note were the numerous coordinations that occurred. As tangled as the spaghetti map was, the time value analysis was even more telling in that more than two hours of a four-hour patient stay was non-value-added time, that is, time when the patient was not being treated by a caregiver. This time was primarily spent waiting for caregivers or for the results of tests. Most of this waiting occurred during the time in an emergency room.

    Seeing What Needed to Be Addressed

    The value stream map gave a clear picture of the number of telephonic and manual coordinations needed at each step. Most of these coordinations were rework, following up on testing, coordination for transportation, and placement in an inpatient bed.

     Figure 2: Mapping Patient and Information Flows Through the Process

    From this assessment, the major opportunity areas for improvement were identified as:

    • General layout of rooms in the emergency department not supporting ease of patient care.
    • Multiple coordinations and wait associated with arranging transportation.
    • Limited emphasis on securing an inpatient bed leading to long wait times.

    With the opportunity areas identified and agreed upon, the team was ready to move onto the Kaizen improvement phase. The improvement phase was a planned three- or four-day event where key process owners were brought together under the guidance of a Lean expert, improvement areas were organized and assigned, and teams worked toward implementing solutions.

    The key differentiation between a Kaizen and typical improvement approaches is that solutions are actually field tested and evaluated during the Kaizen event. This allows the team and process owners to immediately evaluate the effectiveness of the solutions and adjust as needed. The outcomes of this intensive effort are agreed-upon approaches fully implemented and accepted by the process owners. In the case where a significant investment or extended implementation times are required, the team develops a follow-up plan and transfers ownership to the project sponsor.

    Standardizing ED Room Layout

    The team first worked on standardizing the examining room layout. This began with a walk-through of an exam room and understanding the equipment and supply needs of the physicians and nurses. Everything else was cleared out, creating open space to allow easy access. Additionally, rooms were stocked with routine-use supplies to reduce trips to the central storage room. A procedure also was established to restock supplies on a daily basis (Table 1). 

    Table 1: Standardizing Layouts and Stocking Exam Rooms

    Operation

    Problem

    Actions Taken

    Results

    Supply UseInefficiencies in collecting non-chargeable, non-regulated supplies

    -- Remove unused equipment
    -- Standardize layout, labeled, set par levels and reviewed procedure

    -- Increased nurse satisfaction
    -- Reduced trips to supply room

    Streamlining Patient Transport

    To streamline transportation, the team first released the ED-dedicated transporters to the central pool, but reset the expectation that a transporter would respond to a request within 15 minutes. The second change involved establishing a procedure and training the emergency department staff in the same transportation request system used by other departments. The transporter response rate is being tracked, and transportation by patient care associates and nurses has been reduced to the floors, allowing them to focus on patient care (Table 2).

    Table 2: Establishing a Transportation Procedure

    Operation

    Problem

    Actions Taken

    Results

    Emergency Department Transport

    Nurses and patient care associates are transporting patients once they are admitted which decreases nurses and patient care associates time in the emergency room

    -- Pilot solution of using hospital transportation via the PERQs system
    -- Implement using the same protocol throughout the hospital

    -- Cycle time decrease of 101 minutes from care complete.until patient departure from the ED
    -- Testing assigned to complete transport in 10.4 minutes


    Focusing on Bed Management

    Addressing bed management, the team built a procedure and expectations around the bed assignment process, as well as improving communication between the ED staff and bed management. This primarily involved leveraging the existing ED information system and the visual cues that were available but not understood or acted upon. With education, cheat sheets and clearly communicated expectations, bed management is expediting needed coordination to move care-complete patients to inpatient beds (Table 3).

    Table 3: Leveraging the Existing Emergency Room Information System

    Operation

    Problem

    Actions Taken

    Results

    Communciations: ED and Bed Management

    -- Patients are waiting 143 minutes to depart the ED after care is complete
    -- No standard process or targets
    -- Lack of understanding of symbols on MedHost dashboard

    -- Put in place standard operating procedures
    -- Orient staff on key dashboard symbols
    -- Create "cheat-sheet" for symbols and post at every computer

    -- 71 percent reduction (shown during pilot) of time from care complete to patient departure from the ED

    Evaluating Improvement Benefits

    The final step of a Kaizen is to evaluate the benefits associated with the improvements. This is typically measured in the reduced non value-added time that becomes available for increased value-added activities – in this case, direct patient care.

    The improvements and benefits for the ED Kaizen were estimated as:

    • Standardizing layouts and stocking exam rooms resulted in elimination of trips to central supply and increased nurse availability by 35 hours per week.
    • Establishing a transportation procedure resulted in elimination of transports and increased availability of patient care associates and nurses by 84 hours per week.
    • Leveraging the existing ED information system resulted in an accelerated coordination of inpatient beds, or a 71 percent reduction of cycle time, to an average of 42 minutes.

    There also has been a routine increase in staff satisfaction as they have made their jobs easier and more fulfilling.

    Lean offers a lens to evaluate a process through the eyes of the customer and uncover sources of waste, which leads to patient and staff dissatisfaction. Applying a Kaizen to initially measure, then improve a process offers a method to quickly focus on eliminating waste and accelerating cycle times. And, in this case, the Black Belt was able to deliver the needed improvements on time to the emergency department.

    About the Authors: Lou Rhodes has been involved in Six Sigma since 1996 as a Champion, Master Black Belt and Black Belt. Employed by GE Healthcare, he has delivered multiple projects focused on reducing cycle times, improving sales and service processes, and developing effective marketing approaches. He can be reached at louis.rhodes@med.ge.com. Rhonda Davis, a registered nurse since 1983 and holder of a juris doctorate degree since 1991, moved into her current Six Sigma Black Belt role at Memorial Hermann Southwest Hospital in October 2004. Her clinical background focused on women's services, both in an administrative role as well as direct patient care. She can be reached at rhonda_davis@mhhs.com. Eleanor Killam, a registered nurse and Master Black Belt, has 25 years of experience in healthcare, including 15 years of providing consultative client services. She is currently with GE Healthcare's Performance Solutions group, leveraging her clinical expertise and Six Sigma knowledge to help clients capitalize on operational opportunities, as well as train and mentor Black Belts and Green Belts. Currently based in Toledo, Ohio, she can be reached at eleanor.killam@med.ge.com. Kathy Bradley is a consulting manager and Master Black Belt with GE Healthcare, and has more than eight years of experience deploying Lean Six Sigma in the areas of healthcare, manufacturing, engineering and IT. She is currently based in Houston, Texas, and can be reached by email at kathleen.bradley@med.ge.com.

     
    Rate This Article:  Current Rating: 3.90
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2008 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. Six Sigma DMAIC Training Slides
      The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
    2. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    3. Process Management Training Slides
      The 2008 Process Management course is designed in two phases comprised of:352 Powerpoint slidesInstructor notesSlide exp...
    4. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    5. Certified Lean Six Sigma Black Belt E-book
      In 670 pages learn everything within the Lean Six Sigma DMAIC body of knowledge to successfully achieve Black Belt certi...
    6. Gage R&R Excel Template
      Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
    7. Six Sigma Black Belt (DMAIC) Training Slides
      The 2008 Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
     
    Six Sigma AdLinks
    Earn Your Six Sigma Green Belt or Black Belt Certificate Online
    SBTI: Six Sigma for Healthcare
    Juran Healthcare: Transforming Healthcare
    ASQ: Six Sigma Training and Certification
    Novaces: Six Sigma for Healthcare
    iSixSigma Live! Save up to $700
    iSixSigma Job Shop: Find The Key Person


    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2008 iSixSigma. All rights reserved. v3.0lb, 2.1-C-246
    About iSixSigma · Contact Us · Privacy Policy · Site Map
    nogeo