Six Sigma Quality Resources for Healthcare In association withGE Medical Systems
 Main Site > Healthcare Channel > Statistics  > Control Charts Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  iSixSigma Live! Summit
  Agenda
  Registration Info
  Breakthrough Awards
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  iSixSigma Main
  Europe
  Financial Services
  Military
  Software / IT
 Quality Directory 
  Recent Articles
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
   Normality
   Variation
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Recalculating Control Limits

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • Discussion Forum
    "A stable process does not necessarily mean that it is the best performing or ideal process. If the process can be improved to an extent that only 'natural variability' remain, then it could be considered as the ideal process."
    Stable Process

    B
    Download Products
    y Marc Schaeffers and Craig Stephen

    From tedious time consuming task to opportunity for improvement.

    When applying control charts it is common practice to establish the control limits based on the process capability study and then use fix limits on the chart during production. This method is also frequently applied in SPC software programs. The advantage of using fixed limits is that limits can be calculated over a time period where the production was running stable, then that period can be used as a benchmark for future production.

    However, in real life there are always changes in the process, which result in the fixed control limits becoming invalid. If the process improves, fixed limits remain too wide and control charts will not properly register signals for out of control (thereby accepting when false - beta error is induced). As a result, process improvement and opportunities to reduce sampling frequency are overlooked.

    If the process becomes worse due to machine wear, changes in material, etc., the control limits are too narrow. This results in the SPC system reporting control chart points out of control that should not be, if the control limits were naturally calculated (rejecting true - alpha error is increased). This will cause frustration and reflect poorly on SPC methodology in the plant, because our SPC tools are improperly signaling problems, thereby causing operators and staff to waste time addressing conditions, which are simply part of common process variation and therefore the responsibility of management.

    Control limits can be managed to prioritize the efforts of operators and help allocate limited resources on the shop floor. This is done by setting control limits at 3 sigma for critical characteristics and perhaps 4 or 5 sigma for less critical characteristics or characteristics with a high Ppk value.

    There are good reasons to set control limits at particular values, but they should be re-evaluated regularly depending on production volume, but at least once every 3 months to minimize both alpha and beta error in control chart analysis. The number of control charts in use at most companies causes this regular control limit re-evaluation to be a daunting task. However, it can be automated very easily and it can be automated in a way that it will even help to identify which control charts need their control limits recalculated.

    New Indices: Pl and Plk
    For this job we like to introduce 2 new indices for the performance of the limits: Pl and Plk.

    Pl = (Stored UCL - Stored LCL) / (Calculated UCL - Calculated LCL)

    Plk = the minimum of:
         (Stored UCL - calculated grand average) / 0.5 * (Calculated UCL - Calculated LCL) and
         (calculated grand average - Stored LCL) / 0.5 * (Calculated UCL - Calculated LCL)

    If the fixed control limits are the same as the calculated limits the Pl and Plk indices are equal to 1. An index higher than 1 indicates that the process has improved and the limits are too wide. An index smaller than 1 indicates the process has become worse and the limits are too narrow.

    In the report which can be created from the database you should be able to set alarms if an index is outside a specific range. We recommend that the Pl and Plk index should never be less than 1. In that case, control limits can easily generate out of control signals, which may not be present (alpha error).

    The report also allows you to set upper Pl and Plk limits or alarms for groups of characteristics. For example, critical characteristics with a Ppk value not exceeding 1.67 the control limits should be at 3 sigma and the Pl and Plk indices should not exceed 1.2. For less critical characteristics or characteristics with a Ppk value which exceeds 3 the Pl and Plk indices may be higher than 1.2.

    By running the report for groups of characteristics the user can quickly identify if "frozen" control limits need to be adjusted.

    The Report
    When creating the report there are additional considerations. The Pl and Plk indices should not be calculated when less than 25 subgroups exist. It is also useful to know the number subgroups exceeding calculated limits since these can significantly affect control limit calculation and invalidate even calculated control limit application. An example of a report is shown below.

    Figure 1: Calculated And Stored Control Limits
    Calculated And Stored Control Limits

    All necessary information to analyze whether control limits need to be adjusted can be found in the report. For this characteristic all alarms are present. By implementing such a report the tedious task of analyzing control charts for validity of the limits is eliminated and the resulting report can be used as a tool to keep the process of continuous improvement on track.

    About The Authors
    Marc Schaeffers is the President of ITK, a training, consulting and software company in the Netherlands which has been in existence since 1989.

    Mr. Schaeffers has worked for a large number of companies in Europe and Asia implementing SPC and Six Sigma and implementing company wide SPC systems. Some of the companies are ST Microelectronics, 3M, Viasystems, Philips, Océ Copiers, Masterfoods, Fuji Photo Film, FINA, Xerox and Schmalbach Lubeca. Mr. Schaeffers can be reached via email at info@spc-itk.com.

    Craig Stephen is Vice President of SCS, a 21 year old firm devoted to the development and support of statistical software for Quality Assurance. http://www.DataLyzer.com

     
    Rate This Article: 
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2008 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    2. Six Sigma DMAIC Training Slides
      The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
    3. Process Management Training Slides
      The 2008 Process Management course is designed in two phases comprised of:352 Powerpoint slidesInstructor notesSlide exp...
    4. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    5. Certified Lean Six Sigma Black Belt E-book
      In 670 pages learn everything within the Lean Six Sigma DMAIC body of knowledge to successfully achieve Black Belt certi...
    6. Gage R&R Excel Template
      Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
    7. Six Sigma Black Belt (DMAIC) Training Slides
      The 2008 Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
     
    Six Sigma AdLinks
    Earn Your Six Sigma Green Belt or Black Belt Certificate Online
    SBTI: Six Sigma for Healthcare
    Juran Healthcare: Transforming Healthcare
    ASQ: Six Sigma Training and Certification
    Novaces: Six Sigma for Healthcare
    iSixSigma Live! Save up to $700
    iSixSigma Job Shop: Find The Key Person


    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2008 iSixSigma. All rights reserved. v3.0lb, 1.8-C-246
    About iSixSigma · Contact Us · Privacy Policy · Site Map
    nogeo