Six Sigma Quality Resources for Healthcare In association withGE Medical Systems
 Main Site > Healthcare Channel > Statistics  > Control Charts Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  iSixSigma Live! Summit
  Agenda
  Registration Info
  Breakthrough Awards
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  iSixSigma Main
  Europe
  Financial Services
  Military
  Software / IT
 Quality Directory 
  Recent Articles
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
   Normality
   Variation
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Should You Use A Mean Or Individuals Control Chart?

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • Discussion Forum
    "What is the guideline if one of the data in the sample group falls out of either the UCL or LCL, but the average is within the UCL/LCL range? Is any action needed if these discrete data are still within the specification limit?"

    Control Chart Guideline
    By J
    Download Products
    ohn J. Flaig

    To plot individual data or to group the data and plot the mean on a control chart, that is the question. Several authors (not including Shakespeare) have weighed in on this issue and I want to present their arguments and then my own.

    First, let us assume that the process conditions are such that using a subgroup size of n = 1 is not a logical requirement. Under these conditions many SPC texts recommend that the data be subgrouped so that the central limit theorem applies to the subgroup means and hence the means will be approximately Normally distributed. These authors argue that the individuals control chart is very sensitive to non-normality and hence the Type I error may be significantly different than what is expected. They conclude that the individuals control chart should be avoided unless the data is approximately Normal or can be transformed into an approximately Normal distribution [Montgomery, 2001].

    On the other hand Dr. Wheeler says that control charts work irrespective of the distribution, so there is no reason not to use them for individuals data. I am going to take the liberty to suggest that when Dr. Wheeler says that they work he means that for all practical purposes differences in the false alarm rate (i.e., Type I error) do not significantly compromise the adequacy of the control procedure [Wheeler, 1995]. The logic supporting this argument goes back to Shewhart who based his conclusions on the Camp-Meidell theorem, which states if the distribution of X is unimodal (i.e., monotonically decreasing on each side of the mode) and the mode equals the mean, then the probability that X will deviate from its mean by more than k times its standard deviation is less than or equal to 1/(2.25k2)

    Now here is my perspective of the issue. In contrast to Dr. Montgomery's view I feel that the individuals control chart is to be preferred over the mean chart because the mean chart obscures the vision of the practitioner by preventing them from seeing what the process actually looks like. That is, using descriptive statistics (i.e., the mean) to characterize the behavior of the process rather than the actual data results in a loss of information, and game theory teaches us that the best decisions usually result from having the most information. I believe it is critically important for the analyst to have an accurate picture of the process, and the only way to do this is to look at the actual distribution of the individual observations.

    The practitioner should be concerned about the false alarm rate, if the cost of failure is high relative to the cost of inspection or if too many false signals seem to be undermining the confidence of the operators in the program. So, if you are concerned about the false alarm rate, you can always model the observed data distribution and use probability control limits to get more accurate results. Remember that a picture is worth a thousand words, and an accurate picture is worth ten thousand! - Don't throw away information!

    References
    Montgomery, D. C. (2001). Introduction to Statistical Quality Control. 4 Ed., John Wiley and Sons, New York, NY.

    Wheeler, D. J. (1995). Advanced Topics in Statistical Process Control. Statistical Process Controls, Inc., Knoxville, TN.

     
    Rate This Article:  Current Rating: 3.61
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2008 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    2. Six Sigma DMAIC Training Slides
      The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
    3. Process Management Training Slides
      The 2008 Process Management course is designed in two phases comprised of:352 Powerpoint slidesInstructor notesSlide exp...
    4. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    5. Gage R&R Excel Template
      Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
    6. Six Sigma Black Belt (DMAIC) Training Slides
      The 2008 Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
    7. Certified Lean Six Sigma Black Belt E-book
      In 670 pages learn everything within the Lean Six Sigma DMAIC body of knowledge to successfully achieve Black Belt certi...
     
    Six Sigma AdLinks
    Earn Your Six Sigma Green Belt or Black Belt Certificate Online
    SBTI: Six Sigma for Healthcare
    Juran Healthcare: Transforming Healthcare
    ASQ: Six Sigma Training and Certification
    Novaces: Six Sigma for Healthcare
    iSixSigma Live! Save up to $700
    iSixSigma Job Shop: Find The Key Person


    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2008 iSixSigma. All rights reserved. v3.0lb, 2.9-A-244
    About iSixSigma · Contact Us · Privacy Policy · Site Map
    nogeo